Trackform

TRACKFORM

Roadways supplies a high-performance TrackForm road construction solution for national park, farm track, equestrian ground, golf club and cemetery projects requiring a durable hard surface or road base. This innovative material acts as a direct replacement for traditional Type 1 and loose road chippings that require reworking.

TrackForm is produced from recycled road planings, graded at either 0–20mm or 0–40mm depending on your specific project requirements. Blended with cement and ground granulated blast-furnace slag (GGBS), the mixture binds together tightly once compacted and covered with a bitumen emulsion bond coat to form an incredibly stable, solid road surface or foundation. It delivers up to a 40% cost reduction throughout its operational lifespan due to improved longevity and significantly reduced ongoing maintenance expenses.

See TrackForm in action:

Best used for:

  • Private roads and estate tracks
  • Farm tracks and agricultural access routes
  • Equestrian grounds
  • Commercial yards and industrial storage areas
  • Hardstandings and temporary site transport infrastructure
  • Car parks and visitor parking areas
  • Footpaths and public rights of way

What our customers say:

“Whilst only a small job, from ordering and delivery—including our driver, who offered advice and some tips—we had a courtesy visit from a supervisor, who again offered useful tips and help and even offered more products and services. We received a follow-up message from your works manager, and when we did need to reach out for some help, it was offered and supplied promptly and courteously by all concerned. First-class customer experience from the entire team.”

— John Miller, Plant Movements Limited

“We are very pleased with it. It was way cheaper than concrete or tarmac and much better than the broken and dangerous concrete road we had before.”

— Lynne Edwards, Linden Lodge Kennels and Cattery

Compliance:

Produced using recycled road planings (AWCCT) in accordance with Environment Agency reuse rules.

Laying and compaction methodology:

The installation methodology is the same as for standard 6F5 or Type 1 aggregates. The material must be spread, levelled and fully compacted within two to three hours of on-site delivery to prevent premature curing. Do not lay the material during heavy rain or in areas of standing water, as this will wash out the vital cement binder. The surface must be fully covered with a tack coat layer before curing and final surfacing.

Availability:

  • This is a made-to-order aggregate.
  • Order size: normally available for loads over 60 tonnes; however, lower quantities may be available if bulk production is already scheduled for the day.
  • Weekend production and delivery options can be arranged upon request.

Collection and on-site support:

  • Collection point: Woodside Depot, Polegate Road, Hailsham, East Sussex, BN27 3PG.
  • Self-lay protocols: collection or self-lay arrangements must be technically agreed upon in advance.
  • Expert guidance: training, technical guidance and on-site deployment support are available.

Delivery:

  • Bulk delivery options are available across Kent, Surrey, Hampshire, Southampton, East Sussex and West Sussex.
  • Large projects: to ensure your required volume and specification are ready, please order large quantities in advance.

Contact our technical team today at info@road-ways.co.uk to:

  • Discuss your exact technical specifications and volume requirements.
  • Receive expert advice.
  • Check regional production availability and schedule your delivery or collection.

ROADWAYS THE RIGHT WAY: lower your risk, build sustainable, cost-effective and compliant.

Order
EcoSub

ECOSUB

Order
hbm

HBM / CBGM

Order
Recycled type 1 Roadways

RECYCLED TYPE 1 SUB-BASE / CRUSHED CONCRETE

Order